久久国产精品综合精品久久_欧美日韩精品永久免费在线_亚洲第一av免费在线观看_中文少妇按摩被按摩高潮_亚洲国产综合成人综合网站_国产精品一区二区麻豆蜜桃_中文字幕wWw日本_国产视频日韩视频欧美视频_在线亚洲欧美性天天影院_最近2018中文字幕在线高清

Flame retardants division:

+86-13812233176(Manager Jiang)

+86-18156150062(Manager Sheng)

Blowing agent division:

+86-18156150062(Manager Sheng)


Surface activity division:

+86-18936052698(Manager Xu)

+86-17706153456(Manager Zhou)

Hot line:

+86-0561-7888202

+86-0510-87655898

ENGLISH

News

Your Current Location:Home - News - Enterprise news

News

News

Here you are concerned about the company dynamics and industry information

An annual output of 21,000 tons of phosphorus series flame retardant project supporting construction

Release time:2022-12-12 11:27:16      Number of clicks:555

Anhui Runyue Technology Co., Ltd. annual output of 21,000 tons of phosphorus series flame retardant project supporting construction of environmental protection facilities completion date and commissioning time publicity
 

According to the requirements of the announcement on the Interim Measures for the Acceptance of Environmental Protection on the Completion of Construction Projects (National Environmental Regulatory Assessment [2017] No. 4), the completion date and commissioning time of environmental protection facilities supporting the construction of the project are now publicized. Project Overview
Project Name: Annual output of 21,000 tons of phosphorus series flame retardant project
Annual output of 21,000 tons of phosphorus series flame retardant project environmental protection facilities completion and commissioning publicity for the first stage, the specific products and production capacity of the first stage are as follows:
1 set of H blowing agent production equipment, 1 set of BK auxiliary workshop production equipment, 1 set of triethyl phosphate (TEP) production equipment, 3 sets of triethyl phosphate (2-chloropropyl) ester (TCPP) production equipment, 1 set of triethyl phosphate (2-chloroethyl) ester (TCEP) production equipment (cancelled construction) and supporting environmental protection facilities, Forming an annual production capacity of 5,000 tons of H foaming agent, 5,000 tons of urea additives, 10,000 tons of triethyl phosphate (TEP), 40,000 tons of tri (2-chloropropyl) phosphate ester (TCPP).
Construction unit: Anhui Runyue Technology Co., LTD
Construction Location: Anhui (Huaibei) New coal chemical synthetic materials base, south of the base North Road, east of Huaixing Road;
Project Description: This project is to be built in Anhui (Huaibei) new coal chemical synthetic materials base. This project will build 1 3F production workshop and 1 3F finished product warehouse, covering an area of 2642m2. At the same time, one 200m3 BDP storage tank, one 200m3 RDP storage tank, one 250m3 phenol storage tank, one 80m3 toluene storage tank, and one 80m3 cyclohexane storage tank are added, and one set of TPP production unit, one set of BDP production unit and one set of RDP production unit are built. Form an annual production capacity of 21,000 tons of phosphorus series flame retardant products (annual output of 2,000 tons TPP, 9,000 tons BDP, 10,000 tons RDP). The project wastewater treatment relies on the existing sewage treatment station in the plant, and the waste gas relies on the existing waste gas treatment system of "alkali absorption + acid absorption + water absorption + mist remoster +RTO+ cooling tower + three-stage alkali washing" in the plant. The temporary storage of hazardous waste relies on the existing temporary storage of hazardous waste in the plant area.
21,000 tons phosphorus series flame retardant project Total investment: 85 million yuan. (1) Wastewater recovery tank, wastewater treatment multi-effect evaporation concentration salt extraction, semi-buried integrated power treatment facilities (iron carbon micro-electrolysis +Fenton oxidation + neutralization coagulation precipitation + comprehensive regulation tank + pulse anaerobic +MBBR aerobic + precipitation)
(2) waste gas treatment system: The acid waste gas is mainly hydrogen chloride and waste gas produced by BDP unit, and the acid waste gas is mainly introduced into the tail gas absorption tower through the pipeline. The breathing gas of the tank farm is connected to the tail gas main through the breathing pipe and introduced into the tail gas absorption tower. The hydrogen chloride is pretreated by water absorption and alkali absorption process. The hydrogen chloride after absorption and treatment in the BDP workshop enters the "alkali absorption + water absorption + adsorption desorption +RTO device" for treatment, and the tail gas after treatment in the tertiary alkali absorption tower is discharged through the 25m high exhaust cylinder (1# exhaust cylinder). HCl waste gas from the tank farm is absorbed by the three-stage falling film and discharged through a 15m high exhaust cylinder (5# exhaust cylinder). (3) emergency pool, initial rainwater recovery system, toxic and combustible gas detection and alarm measures;
(4) sound insulation and shock absorption equipment and materials;
(5) Hazardous waste temporary storage, waste salt, sludge drying device, garbage collection box;
(6) Plant zone seepage prevention;
(7) Plant greening; (8) The investment of environmental protection facilities for supporting construction is 13 million yuan, accounting for 15.3% of the total investment of the project. 3. Publicity time
Completion Date of environmental protection facilities: October 10, 2022
Commissioning time of environmental protection facilities is: December 10, 2022-March 10, 2023
Four, the main way of publicity
Through Anhui (Huaibei) new coal chemical synthetic materials base official website and on-site publicity methods to the public. Specific contact information is as follows:
(1) Project construction unit name and contact information
Construction unit: Anhui Runyue Technology Co., LTD.
Contact person: Shi Shanwen
Contact number: 15295229528
(2) Undertake the construction of supporting environmental protection facilities unit and contact information


Item

Civil engineering

Equipment engineering

Construction unit

Huaibei Huimin Engineering Construction Co., LTD.

Suhua Construction Group Co., LTD

> Nanli Road, Xiangshan District, Huaibei City, Anhui Province No. 138 Hairong Commercial Building No. 1619


Previous:Anhui Runyue Technology Co., Ltd. year facility completion date and commissioning time publicity
Next:Anhui Runyue Technology Co., Ltd. hazardous waste pollution prevention information disclosure

Return list

News you are interested in
COPYRIGHT ? 2023 ALL RIGHTS RESERVEDAnhui Runyue Technology Co., LTD